Our new HQ is divided into 4 main parts: office, production plant, laboratory, and high bay warehouse. Each of them has the highest standards that contribute to the work comfort and ergonomics. The building is, undoubtedly, a determinant of our constant progress and proof, that the direction we are heading towards is right.
Office
Counting from 2013, we have done a mighty progress. However now, in our own, innovative, and cozy HQ, we are able to progress even faster, build an even tighter team spirit, and grow more as individuals. The headquarters will not only serve as a new home to the company, but relocation there is a symbolical start of a new chapter for the whole firm and gratification for those, who contributed to the growth of Chemnovatic.
If you want to learn more about our company, check the “About us” section.




Production plant
Let us add, that in the new HQ we also have a high bay warehouse with space of around 1500 m².
Laboratory
Our previous laboratory was equipped with world-class analytical equipment operated by experienced chemists and technicians. That allowed us to provide services, among which there were tests and analyses respected in the whole of Europe. However, the new headquarters gives us even greater possibilities!
Here, we have 13 new devices for laboratory analysis within the space of around 150 m². Among the new equipment, there are analytical balances, chromatographs, spectrophotometers, or a densimeter.
Learn more about our laboratory here.
Summary
In the near future, we will formalize and control cooperation with individual suppliers of raw materials to an even greater extent. At the same time, the new HQ allows us to develop our purification capacities and put a high emphasis on the control of this core manufacturing process and its quality. They will be taken to an even higher, unseen before, level!
It would be a lie if we said we had not been excited and hadn’t looked forward to moving to the new headquarters. Now, with a clear conscience, we can say, that the relocation happened according to a strictly detailed schedule, that allowed us to move headquarters, with the continuity of production maintained, and minimized downtime in the production plant.
Let us add, that due to the relocation, our address will change, starting from 1 August 2022. To learn the details check the following link.














